Book your demo

Incidents

Emergency protocol for property managers (with checklist)

Urgency levels, roles, scenario-by-scenario actions and a checklist so your firm responds the same way at 3 am as at 11 am.

María Velasco · 17 Sept 2026 · 5 min read
4 levelsof urgency in your protocol

This guide refers to owners' communities (comunidades de propietarios) in Spain and to the Spanish Horizontal Property Act (Ley de Propiedad Horizontal, LPH).

When an emergency hits, nobody reads a manual. People act with what's at hand and with what was decided beforehand. That's why an emergency protocol isn't a document for the archive: it's the list of decisions your firm makes in a calm moment so it doesn't have to improvise them under pressure.

This guide gives you the full structure: urgency levels, who does what, how to act in the seven most common scenarios and a checklist to apply it to every community.

Why your firm needs a written protocol

  • The law requires you to act. Article 20.c LPH tasks the property manager with ordering urgent measures and immediately informing the president. And the owners' meeting must be told about those measures (art. 14.c LPH).
  • Know-how can't live in a single head. If only your most senior account manager knows where block B's stopcock is, your firm is carrying a risk.
  • Residents judge their property manager by how they respond on the worst night of the year, not by flawless accounts.

The 4 urgency levels

LevelDefinitionExamplesResponse
1 — CriticalRisk to life or physical safetyGas, fire, structural risk, falling façade elementsCall 112 immediately; then the property manager
2 — UrgentDamage getting worse or essential service downActive leak, person trapped in the lift, no lighting on the staircaseOn-call contractor right away
3 — PriorityReal but containable problemBroken garage door, entry phone not workingResolved within 24–72 h
4 — RoutineMaintenanceLight bulb, paintwork, cleaningUsual scheduling

Response times for levels 3 and 4 are indicative: adjust them to your contractor agreements.

Who does what

RoleResponsibility in an emergency
Resident who spots itReport through the official channel, with a photo if it's safe; call 112 if lives are at risk
Caretaker (if any)First containment: shut off water or power, cordon off, let the contractor in
Property managerDecide on the urgent measure, call in the contractor and insurer, inform the president
PresidentBe kept informed and, if there's no property manager, take on their duties (art. 13.5 LPH)
On-call contractorCarry out the work and document what was done
Community insurerAssistance, loss assessment and cover

Action by scenario

ScenarioFirst actionWho to callAfterwards
Leak or floodingClose the stopcock; cut the power if water reaches installationsOn-call plumber or the insurer's assistance linePhotos, insurance claim, check affected flats
Smell of gasEvacuate, don't touch switches or light flames, ventilate if safe112 and the gas distributor's emergency serviceDon't restore supply without a technical inspection
FireEvacuate by the stairs, never the lift112Fire brigade report, loss assessment, notice to residents
Person trapped in the liftReassure them and stay in contactLift maintenance company (rescue service)Log the fault and get it inspected
Power cut in common areasCheck whether it's area-wide or just the buildingElectrician or electricity distributorCheck the panel and emergency lighting
Façade detachmentCordon off the area below the point of fall112 if there's a risk; façade specialistTechnical inspection, possibly necessary works
Intrusion or burglaryDon't go in if someone may be inside112Police report, locksmith, review access points

The emergency sheet for each community

Every community in your portfolio should have a one-page sheet the whole team can open on their phone:

  • Address, number of entrances and floors
  • Location of stopcocks, meters, electrical panels and gas valve
  • Who holds keys to plant rooms and the roof
  • On-call contractors by trade (with 24-hour number)
  • Insurer, policy number and assistance line
  • Lift maintenance company
  • President and vice-president, with phone numbers

After the emergency: closing it properly

  1. Internal report: what happened, when, who acted, what it cost.
  2. Claim and follow-up with the insurer.
  3. Notice to residents: what happened, what was done, what's still pending.
  4. Item at the next owners' meeting: urgent measures taken must be reported to the meeting.
  5. Lesson learned: what was missing from the sheet? Add it.

Checklist for your firm

  • Criteria for the 4 urgency levels written down and shared with the team
  • Complete emergency sheet for every community
  • Confirmed on-call contractors (contact tested in the last 6 months)
  • Insurance details and assistance line for every community
  • Single reporting channel communicated to residents
  • Template for notifying the president
  • Template for notices to residents
  • Log of every emergency with date, action and cost
  • Annual review of the protocol

How Wabee helps

A protocol only works if it's applied the same way at 3 am as at 11 am. In Wabee, reports come in through a single channel (app or WhatsApp) with a photo; the AI classifies the urgency level using the same criteria every time and alerts the contractor; and everything is logged for the follow-up report and the owners' meeting. The protocol no longer depends on who happens to be on call.

Frequently asked questions

Does a community have to have an emergency plan? The LPH doesn't require a document by that name, but it does oblige the property manager to act on urgent matters and report on them. Some buildings may have additional obligations under self-protection or municipal regulations; it's worth checking case by case.

Who pays for an emergency repair? It depends on the source: if it's a common element, the community (and its insurer, depending on the policy); if it's private, the owner. Initial containment shouldn't wait until that argument is settled.

Do I have to report every urgent measure to the owners' meeting? Yes. The owners' meeting is entitled to be informed of urgent measures taken by the property manager (art. 14.c LPH).

Use this checklist at your next portfolio review. And if you'd like the protocol to run itself, see how Wabee does it.

Keep reading

Sources

Want to see wabee in action?

Book a demo
Emergency protocol for property managers · wabee