Incidents
Emergency protocol for property managers (with checklist)
Urgency levels, roles, scenario-by-scenario actions and a checklist so your firm responds the same way at 3 am as at 11 am.
This guide refers to owners' communities (comunidades de propietarios) in Spain and to the Spanish Horizontal Property Act (Ley de Propiedad Horizontal, LPH).
When an emergency hits, nobody reads a manual. People act with what's at hand and with what was decided beforehand. That's why an emergency protocol isn't a document for the archive: it's the list of decisions your firm makes in a calm moment so it doesn't have to improvise them under pressure.
This guide gives you the full structure: urgency levels, who does what, how to act in the seven most common scenarios and a checklist to apply it to every community.
Why your firm needs a written protocol
- The law requires you to act. Article 20.c LPH tasks the property manager with ordering urgent measures and immediately informing the president. And the owners' meeting must be told about those measures (art. 14.c LPH).
- Know-how can't live in a single head. If only your most senior account manager knows where block B's stopcock is, your firm is carrying a risk.
- Residents judge their property manager by how they respond on the worst night of the year, not by flawless accounts.
The 4 urgency levels
| Level | Definition | Examples | Response |
|---|---|---|---|
| 1 — Critical | Risk to life or physical safety | Gas, fire, structural risk, falling façade elements | Call 112 immediately; then the property manager |
| 2 — Urgent | Damage getting worse or essential service down | Active leak, person trapped in the lift, no lighting on the staircase | On-call contractor right away |
| 3 — Priority | Real but containable problem | Broken garage door, entry phone not working | Resolved within 24–72 h |
| 4 — Routine | Maintenance | Light bulb, paintwork, cleaning | Usual scheduling |
Response times for levels 3 and 4 are indicative: adjust them to your contractor agreements.
Who does what
| Role | Responsibility in an emergency |
|---|---|
| Resident who spots it | Report through the official channel, with a photo if it's safe; call 112 if lives are at risk |
| Caretaker (if any) | First containment: shut off water or power, cordon off, let the contractor in |
| Property manager | Decide on the urgent measure, call in the contractor and insurer, inform the president |
| President | Be kept informed and, if there's no property manager, take on their duties (art. 13.5 LPH) |
| On-call contractor | Carry out the work and document what was done |
| Community insurer | Assistance, loss assessment and cover |
Action by scenario
| Scenario | First action | Who to call | Afterwards |
|---|---|---|---|
| Leak or flooding | Close the stopcock; cut the power if water reaches installations | On-call plumber or the insurer's assistance line | Photos, insurance claim, check affected flats |
| Smell of gas | Evacuate, don't touch switches or light flames, ventilate if safe | 112 and the gas distributor's emergency service | Don't restore supply without a technical inspection |
| Fire | Evacuate by the stairs, never the lift | 112 | Fire brigade report, loss assessment, notice to residents |
| Person trapped in the lift | Reassure them and stay in contact | Lift maintenance company (rescue service) | Log the fault and get it inspected |
| Power cut in common areas | Check whether it's area-wide or just the building | Electrician or electricity distributor | Check the panel and emergency lighting |
| Façade detachment | Cordon off the area below the point of fall | 112 if there's a risk; façade specialist | Technical inspection, possibly necessary works |
| Intrusion or burglary | Don't go in if someone may be inside | 112 | Police report, locksmith, review access points |
The emergency sheet for each community
Every community in your portfolio should have a one-page sheet the whole team can open on their phone:
- Address, number of entrances and floors
- Location of stopcocks, meters, electrical panels and gas valve
- Who holds keys to plant rooms and the roof
- On-call contractors by trade (with 24-hour number)
- Insurer, policy number and assistance line
- Lift maintenance company
- President and vice-president, with phone numbers
After the emergency: closing it properly
- Internal report: what happened, when, who acted, what it cost.
- Claim and follow-up with the insurer.
- Notice to residents: what happened, what was done, what's still pending.
- Item at the next owners' meeting: urgent measures taken must be reported to the meeting.
- Lesson learned: what was missing from the sheet? Add it.
Checklist for your firm
- Criteria for the 4 urgency levels written down and shared with the team
- Complete emergency sheet for every community
- Confirmed on-call contractors (contact tested in the last 6 months)
- Insurance details and assistance line for every community
- Single reporting channel communicated to residents
- Template for notifying the president
- Template for notices to residents
- Log of every emergency with date, action and cost
- Annual review of the protocol
How Wabee helps
A protocol only works if it's applied the same way at 3 am as at 11 am. In Wabee, reports come in through a single channel (app or WhatsApp) with a photo; the AI classifies the urgency level using the same criteria every time and alerts the contractor; and everything is logged for the follow-up report and the owners' meeting. The protocol no longer depends on who happens to be on call.
Frequently asked questions
Does a community have to have an emergency plan? The LPH doesn't require a document by that name, but it does oblige the property manager to act on urgent matters and report on them. Some buildings may have additional obligations under self-protection or municipal regulations; it's worth checking case by case.
Who pays for an emergency repair? It depends on the source: if it's a common element, the community (and its insurer, depending on the policy); if it's private, the owner. Initial containment shouldn't wait until that argument is settled.
Do I have to report every urgent measure to the owners' meeting? Yes. The owners' meeting is entitled to be informed of urgent measures taken by the property manager (art. 14.c LPH).
Use this checklist at your next portfolio review. And if you'd like the protocol to run itself, see how Wabee does it.
Keep reading
- What to do when there's an urgent incident in an owners' community
- How to automate incident reporting in residential communities
Sources
- Spanish Horizontal Property Act 49/1960, consolidated text (BOE, in Spanish) — arts. 13.5, 14.c and 20.c
Want to see wabee in action?
Book a demoRelated articles
What to do when there's an urgent incident in an owners' community
A leak, a power cut or a stuck lift: what to do in the first 60 minutes, what Spanish law says and how to stop urgency depending on who reports it.
1 Oct 2026 · 5 minHow to automate incident reporting in residential communities
From chaotic WhatsApp threads to a traceable flow: how to automate the reporting, triage and routing of incidents in owners' communities.
24 Sept 2026 · 4 minAI photo damage assessment: how it works and what to expect
What an AI can and can't see in a photo of a breakdown, how it helps prioritise incidents and why it doesn't replace the loss adjuster.
10 Sept 2026 · 4 min